Model Exchange / interoperability

Power-system model conversion you can verify.

A model that imports successfully can still behave differently after conversion. Full Load Model Exchange is being developed to translate, inspect, and validate power-system models with a record of what was preserved, approximated, or lost.

Engineering workflow

Make conversion outcomes auditable, not mysterious.

Engineers should not have to discover a missing transformer setting or altered constraint after making a planning decision. File translation needs checks that distinguish syntactic success from engineering equivalence.

⇄

Model translation

Translate between engineering tools with clearly documented support and limitations.

⊕

Model diagnostics

Identify model issues and assumptions before they affect downstream analysis.

▤

Conversion report

Review what changed, what was preserved and what needs attention after conversion.

Explore model formats

Explore power-system model formats.

See how model formats differ and what matters when moving an electrical-network case between tools.

Model Exchange is designed around transparent mappings, diagnostic checks, and documented conversion limits.

What can be lost in conversion?

Format explorer

Illustrative
Route under investigation

For illustration only; no model files are processed here.

This is a format guide. The online conversion service is in development.
Evidence of fidelity

Know exactly what the converter did—and did not preserve.

Interoperability is valuable only when the resulting file remains fit for its intended analysis. The proposed reports focus on meaningful model differences, not just successful export.

≋

Topology and parameters

Check connectivity, equipment coverage, unit conventions, and parameter completeness across source and target.

Learn more
◈

Semantic differences

Flag when objective functions, control settings, or solver assumptions do not translate cleanly.

Learn more
▧

Reviewable output

Provide structured warnings and validation receipts that can be reviewed before trusting a downstream result.

Learn more
Release standards

Reliability before general availability.

Each conversion route will need documented compatibility and validation checks before public availability.

  • Explicit supported versions and adapters
  • Warnings for loss of model semantics
  • Representative validation cases and technical documentation
  • Clear service-level limits, privacy practices, and licensing terms
Access under development

Model Exchange: translation you can interrogate.

Model Exchange is in development. Tell us which formats and modeling requirements are most important to your work.

Ask about early access
Build with more confidence

What would be costly to lose in translation?

Tell us the source format, target tool, versions, and model features you cannot afford to lose. We welcome concrete interoperability problems.